IMS Systems Company Profile History of Projects
.
IMS Systems
.
Overview
.
Takeoff
.
Material Control
.
Warehousing
.
Spool Tracking
.
Steel Tracking
.
Cable Reel Management
.
Site Trailer Tracking
.
Material Control
  • Download of material requirements from takeoff system or external material management systems to allow for tracking of material requirements and availability.
  • System function allows for preparation of material requisitions by supplier of commodity code to enable shops to request order releases from project suppliers.
  • Requisition quantities can be provided with automatic pad quantities for current IFC drawings and/or total estimated project requirements by shop location.
  • Order release function to allow shops or site to pull materials as needed for IFC drawings. Pulling only by IFC drawings to eliminate surplus materials at shops and site will reduce material handling.
  • Immediate comparison between actual shop cut sheet detailing and IFC engineering demands and original project engineering MTO requirements to flag additional requirements.
  • MTR/Heat Number traceability to specific components with link to individual spools.
  • Bulk supplier ETA commitments reflected at the spool level.
  • Allocation of materials are based on project fabrication priorities at the spool level.
  • Validate shop claims for shortage of materials.
  • Download of supplier shipments with link to material receiving for issued engineering requisitions.

Select a green box from the diagram below to see samples of the Material Control system. To see a diagram of the MTR tracking process click here >

    To Top   |   2005 IMS Fab Track Ltd. All Rights Reserved.